International competition: Torpedo drilled its way in to the final

Being faster than a snail is a tremendous challenge for a tunnel boring machine. ไดอะแฟรม at DHBW Mosbach have mastered this, and also have made it through to the final of a global competition with the ?Dirt Torpedo?. WIKA co-sponsored the project by giving measurement technology and a grant.
Students at DHBW Mosbach proudly presented their ?Dirt Torpedo?. DHBW Rector Prof. Dr. Gabi Jeck-Schlottmann, Gerhard Lauth, Managing Director of the Pro DHBW Mosbach foundation, and CEO of WIKA Alexander Wiegand SE & Co. KG, Alexander Wiegand, also attended the presentation of the innovative tunnel boring machine.
Tunnel boring machine made it into the final round
Of the full total of 400 entries in your competition, called by the American entrepreneur Elon Musk (co-founder of Tesla among others), twelve managed to get through to the final round. The finalists were tasked with drilling a 30-metre-long tunnel in California?s Mojave Desert. However, because of conditions being changed on-site at short notice, only the crew from TU Munich were able to start. The students at DHBW Mosbach were disappointed concerning the way your competition ended, which was, ultimately, not just a competition at all. Nevertheless, they’re justifiably proud of their ?Dirt Torpedo?.
Student competition project with WIKA measurement technology
The team spent a year working on the 2 2.63-metre-long tunnel boring machine. The ?Dirt Torpedo? progresses at a speed of 5.4 metres each hour. That?s one metre greater than a snail ? and snails are often faster when compared to a conventional tunnel boring machine.
WIKA?s measurement technology is located in the rear portion of the ?Dirt Torpedo?. From there, a fibre-reinforced, fast-curing concrete is pressed contrary to the tunnel wall through twelve valves to support it. To monitor the pressure of the concrete feed, WIKA provided twelve diaphragm seal systems with mounted transmitters of model S-20 and a 1?10 V output signal. The flush diaphragms of the diaphragm seals are extra strong to allow them to permanently resist the abrasive forces of the concrete. No residues can adhere to their surface. WIKA?s sponsorship of the ?Torpedo? project amounts to a total of 20,000 euros.
Long-term collaboration with the cooperative state university
The company and DHBW Mosbach have been closely associated since 1985. As a dual partner, WIKA enables future specialists to graduate in a current total of seven degree programmes, with practical phases at WIKA?s headquarters in Klingenberg. So far, around 250 WIKA students have graduated from the DHBW. WIKA also offers the status of a ?Gold Partner?, this means it provides the university with ?an extraordinary level? of support. Partner companies get excited about the university through the Pro DHBW Mosbach foundation, and therefore promote the dual system. Furthermore, Alexander Wiegand is the Chairman of the Board of Trustees.
Note
More info on our diaphragm seal systems and pressure transmitters (pressure sensors) are available on the WIKA website. For those who have any questions, your contact will gladly help you.

Scroll to Top